Vermeer

Within a pre-engineered building, a two-story office and showroom were constructed, as well as installation of a standing seam roof, perforated acoustic ceiling panels and interior /exterior stairs and railing. 300’ of crane runway was constructed along with a full height liner panel in the warehouse.

  • Erected pre-engineered building
  • 2 story office / showroom
  • Installed standing seam roof
  • Installed perforated acoustical ceiling panel
  • Installed interior and exterior stairs and railing
  • Installed 300’ of crane runway
  • Installed full height liner panel in warehouse